Before you request a quote
Collect dimensions, weights and access drawings before contacting Koninklijke Saan
Prepare a technical inventory with photos, decide who disconnects, reconnects and tests equipment, and note site permissions. For an art move, document condition, packaging and handover; for cleanroom work, define hygiene and shutdown windows.
1
Requesting a quote
Use +31 20 6606060, [email protected] or the contact form; industrial/specialist project pages also publish [email protected]. Provide weights, dimensions, equipment/object inventory, route, access, floor/loading constraints, timing and storage. Published contacts are Overdiemerweg 34, 1111 PP Diemen; Lizzy van Dorpweg 2, 5032 MR Tilburg; Rutherfordweg 104, 3542 CG Utrecht. The current register additionally lists Rutherfordweg 93, 3542 CN Utrecht; confirm its operational purpose with Saan before planning a visit or delivery. Have the quote name the contracting company: the website identifies Koninklijke Saan B.V., while shared conditions also name the distinct Saan Horizontaal & Verticaal Transport B.V.
2
How prices are set
A survey and plan precede the project quotation. Request the total and VAT basis for preparation/engineering, staff, transport, lifting/rigging, packing, permits, specialist partners, storage and final installation. Agree waiting, schedule changes and cancellation separately. The conditions hub publishes several service-specific sets and cancellation documents; confirm which apply to the accepted order rather than assuming one household-moving tariff.
3
Insurance and liability
Published conditions distinguish activities such as lifting, storage and road transport and refer to the applicable service rules. Ask which contracting company, liability conditions, current policy, valuation, limits and deductible apply to the actual machine/artwork and each stage. Confirm any all-risk or business-interruption cover explicitly in the written proposal.
4
Preparing for the move
Prepare technical inventory, photos, dimensions, weights and access drawings. Agree disconnection, reconnection, testing/commissioning, lifting plans and site permissions. For production or cleanroom work, define hygiene protocols and shutdown windows. For art, document condition, packaging and handover. Confirm the actual working/storage site; a registered address alone does not schedule service there.