This first-floor 3-room apartment is located at Mahatma Gandhistraat 5 in Purmerend and has a total living area of 73.96 m². The building was constructed in 1992 and the apartment is reached via a stairwell; there is no lift. Internally the layout includes a living room, kitchen, bathroom and two bedrooms. An external storage room on the ground floor is provided (4.07 m²). The apartment has an energy label A and double glazing.
The living room measures 32.79 m². The two bedrooms measure approximately 11.25 m² and 13.50 m² respectively. The kitchen is 8.15 m² and the bathroom is 4.20 m². The apartment is a gas-free dwelling and is equipped for electric cooking; the installed kitchen dates from 2011 and the ceramic hob is included in the items listed for takeover. Other items listed for takeover include the floor covering, roller blinds, two wardrobes and shelving in the hall cupboard and storage room.
Standard building features and amenities include an intercom and external storage. Heating and energy details include electric cooking and double glazing; the property is listed as an aardgas-free (gas-free) home. Service costs are specified separately. The net monthly rent is €731.93, service costs €19.94 and the gross rent is €751.87. For candidates who qualify as urban renewal priority applicants, a maximum rent of €1,164.94 applies.
Allocation and conditions: the rental method is on the basis of points. Minimum household size is 1 and maximum 4 persons. Minimum age to apply is 18 years. Maximum taxable income thresholds for allocation are listed at €49,669 for single-person households and €54,847 for multi-person households (price level 2025); an income statement from the tax authorities for 2023 is required for allocation. A viewings appointment is stated as taking place on Monday 1 September by invitation (candidates 1 and 2 at 11:00, candidates 3 and 4 at 11:30); the viewing will be together with the departing tenant and no staff member will be present. The expected rental date is shown as 22 September 2025 and the deadline to respond is listed as 26 August 2025, 23:59.